海外风电

OWE 2017: Senvion keeps tight-lipped on 10MW turbine

2017-06-09 10:45  来源:windpower  点击:764
UK: Having let slip that it was working on a 10MW-plus offshore turbine at the AWEA conference in May, Senvion has declined to provide any further details at the London offshore event.
{"status":"error","msg":"\u83b7\u53d6Token\u5931\u8d25 : reach max api daily quota limit, could get access_token by getStableAccessToken, more details at https:\/\/mmbizurl.cn\/s\/JtxxFh33r rid: 697635a6-4003e366-2a41605d"}